top of page

Lapai Gold Project

Lapai Gold Project

 The Lapai project consists of various prospects within the area. 

 Initial observations indicate a hydrothermal-epithermal type deposit situated within granitic hosts. The area is easily accessible by paved roads within 4 kilometers of the project area and main tracks crossing the focus area.  Geopolitically, Lapai is considered stable with a safe and friendly farming community.

 Four primary North-South striking mineralized quartz veins have been positively identified, each with a minimum length of 3 km and still open ended. Additionally there are multiple secondary quartz veins occurring within East-West striking shear zones intersecting the North-South striking primary veins. Drilling is currently in progress on the project.

Lapai02.jpg

Lapai Gold Project Highlights 

Lapai Gold Project Highlights

 • 10 Km of proven mineralization on

 surface

 • Soils and Grab Sampling completed

 • Ground Magnetic Surveys and IP Surveys

 • Trenching completed covering all

 10 km of mineralization

 • 25 year Mining Lease

 • Grades up to 200 g/t

 • JORC Report completed

 • Current 6000m Drilling program underway

Lapi Gold Project Highlight.png

Drilling Program

© Copyright 2021 - Allied African International Mining Company

bottom of page